quotation for refurbishment of cooling tower in hall - 6
1. removal of old base frame structure and fitted new base structure for both cooling towers (2x2m, ms i beam structure)
2. replacement of honeycomb fills material and its frame made of ss for both colling towers.
3. fabrication and mounting of side ss net of 6 m
4. the 8 nos. of concrete column to be repaired of both cooling towers
5. overall cleaning and painting of both colling tower
6. replacement of ball type float valves; four numbers
7. replacement of ms chequered plate (6 mm thick) for trench near cooling tower
8. painting of ms c channel frame and plates near cooling tower
9. maintenance of pipe fittings and valves of makeup water line. |